Green Meter Price In Pakistan 2024 Installation Setup

A Three-Phase Bidirectional Static Energy Meter, also known as a Green Meter, is a precise device used to measure both energy consumption and generation in a three-phase electrical system. It can track how much energy is used and how much is produced, making it perfect for net metering. This allows users to sell excess power back to the grid—total cost of Installing Net Metering Connection 2024.

Single Phase Green Meter Price in Pakistan

Expense Expected Cost (PKR)
Sanction Load Approval (Single Phase to Three Phase) 30,000
Document File from AEDB (Certified) 35,000
Green Meter 40,000
Three-Phase Cable 10,000
Additional Costs 35,000
Total Cost 150,000 Approximately

Hybrid Systems

Hybrid Systems

Green Meter Price in Pakistan 2024

More people are becoming aware of solar energy and are installing larger solar systems than needed. If you want to install a Green Meter, apply to your local electric company (Disco). After an inspection, they will send you a demand notice. Once you pay this notice, they will install the three-phase Green Meter at your location.

Green Meter WAPDA Unit Price in Pakistan

Green Meters for Solar Panels are available in various cities across Pakistan, including Karachi, Lahore, Islamabad, Peshawar, Multan, Faisalabad, Gujranwala, Gujrat, Quetta, Gilgit, Murree, and more. They are used with solar inverters and are approved by local electric companies like Pesco and Lesco.

Solar Green Meter Price in Pakistan

In Pakistan, the power sector faces high prices and frequent power shortages, especially during summer, with load-shedding happening every hour at peak times. Recently, progress has been made with solar systems.

Aluminium Window Today 2024 Price in Pakistan

How to Apply for Green Meter in Pakistan

  1. Install Solar Panels: Have certified professionals install your solar system. It needs to have at least a 5KW capacity to qualify.
  2. Get Load Approval: If needed, apply to WAPDA to upgrade your electricity load to three-phase. This will involve a fee and some paperwork.
  3. Prepare Documents: Work with AEDB-certified installers to gather the necessary documents, such as your CNIC, electricity bill, and details about your solar equipment.
  4. Submit Your Application: Send your application and documents to the WAPDA Executive Engineer (XEN). Make sure everything is correct to avoid delays.
  5. WAPDA Inspection: WAPDA will inspect your solar setup to ensure it meets safety and technical standards.
  6. Receive Permission Letter: You’ll get a permission letter to buy a green meter after approval.
  7. Buy Equipment: Purchase the required three-phase cable and green meter, ensuring they meet quality standards.
  8. Install Green Meter: WAPDA officials will install the green meter and complete the net metering setup.